Project name | Engineering content | Construction time |
Supply & Installation of Heat Exchange Stations Equipment for Yingkou Dashiqiao Component in Liaoning Third Medium Cities Infrastructure Project (World Bank Loan) | 46 Heat Exchange Stations | 2009-2011 |
Alkali Recovery Combustion Section Sub-project & Alkali Recovery Evaporation Section Sub-project, Shandong Hai River Basin Pollution Control Project | 2450t/d (Solid Alkali Recovery) | 2008-2013 |
Melamchi Water Supply Project, Construction of Headworks and Tunnel, Nepal | 27km | 2009 |
Zhengzhou-Xi’an Railway Project, Lot 104 Isolating Switch and Load Switchgears for Ministry of Railway (ADB Loan) | 345 sets | 2009-2010 |
Package No. 2-1, 2-2, 2-3, 3, 7, 8 and 9 of Hefei Sub-project, Anhui Environment Improvement Project | Welding Steel Pipes, Seamless Steel Pipes, SCADA System, Natural Gas Refueling Station and Process Equipment | 2004-2008 |
Package No. 2-1, 2-2, 2-3, 3, 7, 8 and 9 of Hefei Sub-project, Anhui Environment Improvement Project | Welding Steel Pipes, Seamless Steel Pipes, SCADA System, Natural Gas Refueling Station and Process Equipment | 2004-2008 |
Package No. 2A-3 of Desulphurization/HCN Removal Plant Sub-project and Package No. 6B-2 of Stainless Steel Slag Treatment Sub-project, Taiyuan Environmental Improvement Project | Desulphurization/HCN Removal Plant-General Equipment and Stainless Steel Slag Treatment Sub-project-General Equipment | 2007-2008 |
Package No. 3, 5 and 13 of Tongling Yaxing Coking Gas Limited Liability Company (TCG) Pollution Treatment Sub-project, Anhui Acid Rain Control and Environmental Improvement Project | Coke Oven Auxiliary Equipment, Installation and Construction Materials and Laboratory Equipment | 2006-2008 |
Package No. 1, 2, 3 and 6 of Fuyang Sub-project, Anhui Environment Improvement Project | Welded Pipe, Valve, Pressure Regulator, etc., Machine & Vehicle and SCADA System | 2004-2007 |
Package No. 4, 9 and 12 of Xinyang Sub-project, Henan Environment Improvement Project | Antisepsis and Cathode Protection, Filling Gas Station and Working & Maintenance Equipment | 2004-2006 |
Package No. 3 and 6 of Ma’anshan Sub-project, Anhui Environment Improvement Project | Vehicle Gas Refueling Station and Pipe Materials | 2005-2006 |
Package No. 2, 3 and 5 of Chuzhou Sub-project, Anhui Environment Improvement Project | Valves & Pressure Regulator, Pipes and Mother Gas Station System | 2004-2005 |
Package No. 5 of Jiaozuo Sub-project, Henan Environment Improvement Project | High Pressure Pipeline | 2004-2005 |
Package No. 2 of Tongling Sub-project, Anhui Environment Improvement Project | Pipes | 2004-2005 |
Heat Supply Network Automation Sub-project, Comprehensive Energy-saving Cogeneration Project for Jinan City, Shandong Province (European Investment Bank) | 441 Heat Exchange Stations | 2012-2014 |